|
Results - Lessons learned
|
|
|
|
|
| |
| Twinnings :
Bulgaria / Greece |
| Themes:
Action progress, methodology, Planning
management, plan, programme measure, WFD
implementation |
| Names : |
Black Sea River Basin
Directorate
Region of Crete / Directorate of water |
|
Mission reference
: |
| 2006 C3 T18 |
|
Abstract : |
|
The project focuses
on specific areas of interest,
based on Integrated Water Resources Management (IWRM),
that have been identified as:
-
Implementation of the Water Framework
Directive
-
(WFD): the
GIS works developed Article 5 requirements.
-
Groundwater
(exploitation and protection)
-
Monitoring
networks
-
Administrative framework (organization of
the River Basin authority)
|
|
Contacts : |
| Bulgaria |
Greece |
Vencislav NIKOLOV
E-mail:
bdvarna@bsbd.org |
Dimitrios
PAPAMASTORAKIS
E-mail:
watermgn@otenet.gr
|
|
Download : |
|
2006 C3 T18 Mission 1(Bulgaria)
Reporting guidelines
(109Ko)
2006 C3 T18 Mission
2 (Greece)
Reporting guidelines
(69Ko)
2006 C3 T18 Mission
3 (Bulgaria)
Reporting guidelines
(69Ko)
|
|
Go
to the twinning table
|
|
|
|
|
|
|
|
Home -
Site Map -
For all comments on this web site or request, please contact us - Members Access |